Alfred Müller AG is building 75 owner-occupied apartments in a prime location in Schwyz.
On 7 August 2026, Alfred Müller AG submitted the design plan for the Kappelmatt construction project in Schwyz, reaching a major milestone in the project. The attractive development will comprise 75 owner-occupied apartments in a prime location.
Back at the end of 2020, Alfred Müller AG held a design competition with four invited architects. At the end of 2022, the evaluation panel, which included representatives of the canton and the municipality of Schwyz, selected a winning design. It convinced the panel with its urban design and functionality and ensures a high quality of living.
The project was then further developed and refined. Along the way, legal questions were resolved, laying an important foundation for the next stages of the project.
With a variety of views and attractive floor plans, the 75 owner-occupied apartments offer a high quality of living and add to the range of housing available in Schwyz. Loosely arranged across the site, the buildings blend harmoniously into their surroundings and open up generous views of the surrounding landscape. The open space and access concept highlights the idyllic setting, with orchards and other generous green spaces.
Next project steps
- Approval of the design plan by the authorities
- Preparation of the construction project
- Public display and approval of the construction project
- Construction