Header

LG site: involving the local community

Back to overview
Foto 20161309 018 Zentrum Bahnhof Siemens E0296c2f

What’s next for the former Landis+Gyr site? Now the ball is in the public’s court. Everyone is invited to view the urban design concepts that have been submitted and to share their views on the site’s future use.

Because of its size and prominent location, the LG site plays a key role in how Zug is perceived in urban planning terms and in shaping its urban character. Where electricity meters were once produced for the whole world, an attractive and vibrant new district with compelling architecture is to be created.

Exhibition of the submitted urban design concepts

The plans for the site are now taking shape: the five landowners, including Alfred Müller AG, will go forward with the urban design concept developed by Christian Salewski & Simon Kretz Architekten, the winners of the public study commission. All concepts submitted as part of the process will be shown in an exhibition at Gartenstrasse 2a in Zug from 25 September to 9 October 2020. The exhibition is open Monday to Friday from 4 pm to 8 pm.

Participation on two levels

The LG site’s sponsoring body is also involving the public in the land-use planning, which will be drawn up in the next step. On the one hand, representatives from all sections of society in the city and canton were invited to a participation event on 24 September 2020. Participants discussed how this centrally located, exceptionally well-connected area should be designed attractively and brought to life in the future. On the other hand, residents are invited to take part in the e-participation process at www.lg-zug.ch/mitreden from 2 to 23 October 2020 and give their opinion on how the site should be used. The results of both the event and the survey will feed into the further development of the land-use concept by the landowners responsible.

More information www.lg-zug.ch